Communities oriented to the maintenance of the pipeline and pumping stations grew up along the route. When built, the pipeline was the longest fresh-water pipeline in the world.However, there is evidence that the explorer of the 1860s The pipeline ran alongside the route of the earlier route of the The scheme required significant infrastructure in power generation to support the pumping stations. Find out more about Perth & WA's water sources, alternative water options and learn about network and water supply scheme. When completed in 1902 it was claimed to be the highest overflow dam in the world. Early measures to increase water supplies soon proved inadequate, as Perth’s citizens simply pursued a more profligate pattern of water use. The pipeline continues to operate today, supplying water to over 100,000 people in over 33,000 households as well as mines, … Water from the pipeline was utilised for a number of country towns adjacent to its route, and also into the In 2007 two items were produced that were overviews of the scheme:
However, with improved power supplies and modern machinery and automation, the scheme now has more unattended pumping stations operated by fewer people required to live along or close to the line. Historically it was much larger in size. In the early 1920s, irate voters finally convinced the state government to invest in a more reliable water supply system, including the Hills Water Supply Scheme, which took nearly twenty years to complete. The history of the construction of the Goldfields Water Supply Scheme was detailed in the 2007 documentary Lower Helena Pumpback dam is now also used to supply water to the Goldfields region. It is considered a landmark of the City of Perth Water for the IWSS is now comprised of a combination of sources, including desalinated seawater, groundwater, groundwater replenishment and streamflow into dams.. The Water Authority in turn had been created in 1985 through a merger of the former Metropolitan Water Authority, which operated in Perth, the state capital, and the water and wastewater operations of the former WA Public Works Department. The Goldfields Water Supply Scheme is a pipeline and dam project that delivers potable water from Mundaring Weir in Perth to communities in Western Australia's Eastern Goldfields, particularly Coolgardie and Kalgoorlie. On 16 July 1896, the The scheme consisted of three key elements – the Mundaring Weir, which dammed the There was also a concern that the gold discoveries would soon dry up and the state would be left with a significant debt to repay but little or no commerce to support it. The shorelines have been regularly changed.Considerable reclamation has taken place on both sides of the river. In the Noongar language, The earlier shore line of Perth Water can be identified by the line made by Mounts Bay Road, and its extension to The Esplanade. The pipeline route was therefore closely aligned with the All the original pumping stations were powered by steam.Branch mains – or extensions were started as early as 1907. Water from the dam is currently pumped back into Mundaring Weir.The scheme is listed as a National Engineering Landmark by From some earlier photographs and images made from Kings Park it is possible to ascertain the earlier river-edges, or banks, from tree lines. Water sources for our largest scheme, the Integrated Water Supply Scheme (IWSS), have changed dramatically. Water Corporation was created in January 1996, in a restructure of the water industry in Western Australia. The photo here is of the part of the river that was filled in to accommodate the The main route for deep draught boats to navigate Perth Water is from the Narrows Bridge to During the early 1890s, thousands of settlers had travelled into the barren and dry Throughout the 1890s, water availability issues in Coolgardie and in the Kalgoorlie – Boulder region were causing concern to the population. For example, in 1879, landfill of Perth Water was used to create For the construction of the Narrows Bridge and its approaches, considerable amounts of the north-west section of Perth Water were reclaimed.The former river bank in that area is equivalent to the edge of Since the establishment of Perth, there have been either jetties or landing and mooring facilities at the location of Ferry companies at the terminal have improved re-fuelling techniques to reduce the amount of oil pollution in Perth Water.The most accessible photographs that show the degradation of the space over time is in the collection in In the 1950–1951 Lord Mayor's report for the City of Perth an early map of Perth from 1838 was reproduced.In 1989, the Department of Aboriginal Sites published a book with a reproduction of a 1909 cancelled plan of Perth that shows place names:This body of water is also known as Derbarl Yerrigan, a name which has since been adopted for the whole of the Swan River.